3BHE044249R04002 GDC806 C4002 ABB Control Motherboard AC 800PEC Series
ABB

3BHE044249R04002 GDC806 C4002 ABB Control Motherboard AC 800PEC Series

SKU: 3BHE044249R04002
Categories : ABB
In Stock
  • Dimensions: 14.7 cm x 10.3 cm x 3.5 cm
  • Country of origin: Sweden
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

The ABB 3BHE044249R04002 GDC806 C4002, also cataloged as the GDC806 C4002 Control Motherboard, operates as a dedicated hardware component for centralized system logic routing and local module coordination within AC 800PEC processing platforms.

Variant Configuration & Circuit Architecture

The hardware catalog sequence defines internal circuit routing and baseboard functional tiers:

  • 3BHE044249R04002: OEM hardware assembly part number for the physical printed circuit motherboard.
  • GDC806: Dedicated motherboard subrack platform designation for AC 800PEC controller nodes.
  • C4002: Circuit board revision code specifying integrated signal bus topology and power bus distribution.

Technical & Environmental Specifications

Parameter Specification
Model 3BHE044249R04002 GDC806 C4002
Brand ABB
Origin Sweden
Weight 0.8 kg
Shipping Dimensions 14.7 cm x 10.3 cm x 3.5 cm
Operating Temp -10 to +60 deg C
Power Consumption Baseboard load driven (24 VDC supply interface)
Operating Voltage 24 VDC
Functional Category Control Motherboard
Harmonized Tariff Code 8537101190

High-Speed Backplane Bus Integration

The motherboard architecture provides optimized backplane bus communication velocity across attached expansion daughtercards and processor modules. Integrated firmware flash compatibility guarantees continuous system clock synchronization across high-density controller slots, eliminating inter-module transmission delays during fast control loop cycles.

Delivery Package Details

  • 1 x ABB 3BHE044249R04002 GDC806 C4002 Control Motherboard
  • 4 x Subrack corner standoff mounting screws

Assembly & Wiring Guidelines

  • Main Power Cutoff: Ensure external 24 VDC power supplies are fully isolated before installing or seating the motherboard into the enclosure chassis.
  • ESD Safe Handling: Operators must wear a grounded electrostatic discharge wrist strap when touching exposed board edges or connector pins.
  • Mechanical Securing: Fasten all board standoff hardware to the enclosure mounting plate to maintain ground continuity across the entire assembly chassis.
  • Signal Cable Separation: Route low-voltage system bus cables separately from power supply conductors inside cabinet wire trays.

Frequently Asked Questions

  • What supply voltage does the 3BHE044249R04002 control motherboard require?

    The motherboard operates from a standard nominal 24 VDC power distribution rail within the system cabinet.

  • Is live insertion or hot-swapping supported for this control motherboard?

    No, power to the subrack assembly must be completely de-energized prior to installing or removing the motherboard.

  • What range of ambient temperatures does the board support during operation?

    The motherboard is specified for operation within ambient thermal limits of -10 deg C to +60 deg C.

  • How is chassis earthing established on the GDC806 motherboard?

    Chassis earth grounding is established directly via the metal mounting standoffs screwed into the grounded cabinet frame.

  • Are configuration DIP switches required to be set prior to motherboard installation?

    Board-level routing is handled automatically via system bus addressing; verify physical jumpers match OEM hardware documentation.

  • What physical dimensions are required for chassis space planning?

    The unit measures approximately 14.7 cm x 10.3 cm x 3.5 cm, requiring standard clearance for backplane heat dissipation.

  • How does the board prevent damage from static discharge during installation?

    Integrated ESD suppression networks safeguard signal traces, provided technicians follow standard wrist-strap grounding procedures.

  • Does replacing the motherboard require reloading controller firmware?

    Firmware resides on the main CPU module; however, system initialization verifies motherboard hardware compatibility on startup.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

ABB Robotics Unveils IRB 1700 and Physical AI at CIIF 2026
Nov 03, 2026
Maxwell
ABB Robotics Unveils IRB 1700 and Physical AI at CIIF 2026
ABB Robotics has made its most significant product announcement of the year at the 26th...
Read More
Apple iPhone 18 Pro Mass Production at Foxconn Zhengzhou with AI Automation
Nov 02, 2026
Maxwell
Apple iPhone 18 Pro Mass Production at Foxconn Zhengzhou with AI Automation
Apple's iPhone 18 Pro is entering mass production at Foxconn's Zhengzhou facility, marking the first...
Read More
CIMC Raffles Launches World's First Semi-Submersible Wind-to-Hydrogen Platform Shenhai Hydrogen No. 1
Nov 02, 2026
Maxwell
CIMC Raffles Launches World's First Semi-Submersible Wind-to-Hydrogen Platform Shenhai Hydrogen N...
CIMC Raffles Offshore, a subsidiary of China International Marine Containers Group, has launched the world's...
Read More
Envision Technology Launches AI Wind Storage Integrated Machine Product Matrix at CWP 2026
Nov 02, 2026
Maxwell
Envision Technology Launches AI Wind Storage Integrated Machine Product Matrix at CWP 2026
Envision Technology has unveiled a comprehensive AI Wind Storage Integrated Machine product matrix at the...
Read More
Hithium Chongqing Base Becomes World's First Lighthouse Factory for Energy Storage Battery Production
Nov 01, 2026
Maxwell
IFR Reports Global Industrial Robot Stock Surges to 5 Million Units as China Drives Growth
The density of industrial robots per 10,000 manufacturing employees in China has climbed to approximately...
Read More
IDC Reports Q3 2026 Global Smartphone Shipments Plunge 22 Percent Amid Memory Chip Crisis
Nov 01, 2026
Maxwell
IDC Reports Q3 2026 Global Smartphone Shipments Plunge 22 Percent Amid Memory Chip Crisis
The global smartphone market experienced its sharpest quarterly decline on record in the third quarter...
Read More
Hithium Chongqing Base Becomes World's First Lighthouse Factory for Energy Storage Battery Production
Nov 01, 2026
Maxwell
Hithium Chongqing Base Becomes World's First Lighthouse Factory for Energy Storage Battery Produc...
Hithium Energy Storage's Chongqing base has achieved a major production milestone, reaching 200 gigawatt-hours of...
Read More
China Three Ministries Release Hydrogen Energy Comprehensive Application Pilot Management Measures with 1.6 Billion Yuan Central Funding
Oct 31, 2026
Maxwell
China Three Ministries Release Hydrogen Energy Comprehensive Application Pilot Management Measure...
China's Ministry of Industry and Information Technology (MIIT), Ministry of Finance, and National Development and...
Read More
Intel Seeks FCC Exemption for Foreign Robots to Maintain U.S. Semiconductor Production Lines
Oct 31, 2026
Maxwell
Intel Seeks FCC Exemption for Foreign Robots to Maintain U.S. Semiconductor Production Lines
Intel Corporation has submitted a formal petition to the U.S. Federal Communications Commission (FCC) requesting...
Read More
China's First Million-Ton Low-Concentration CCUS Full-Chain Demonstration Project Starts Construction at Shengli Oilfield
Oct 31, 2026
Maxwell
China's First Million-Ton Low-Concentration CCUS Full-Chain Demonstration Project Starts Construc...
China's largest carbon capture, utilization, and storage (CCUS) initiative targeting low-concentration emissions has officially commenced...
Read More