CS1W-CLK23 Omron Controller Link Unit CS1 Series
CS1W-CLK23 Omron Controller Link Unit CS1 Series
CS1W-CLK23 Omron Controller Link Unit CS1 Series
CS1W-CLK23 Omron Controller Link Unit CS1 Series
CS1W-CLK23 Omron Controller Link Unit CS1 Series
Omron

CS1W-CLK23 Omron Controller Link Unit CS1 Series

SKU: CS1W-CLK23
Categories : All Products
In Stock
  • Dimensions: 130 x 35 x 110 mm
  • Country of origin: Japan
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

The Omron CS1W-CLK23, also cataloged as the CS1W-CLK23 Controller Link Unit, operates as a dedicated hardware component for deterministic network data exchange within Omron CS1 Series PLC backplanes.

Hardware Architecture & Suffix Breakdown

  • CS1W: CS Series CPU bus unit system classification code.
  • CLK: Controller Link dedicated communications function designation.
  • 2: Medium variant identifier denoting wired shielded twisted-pair physical layer configuration.
  • 3: Optical/Electrical hardware generation revision designator.

Operational Parameters

Parameter Specification
Model CS1W-CLK23
Brand Omron
Unit Classification CS1 CPU Bus Unit
Network Type Controller Link (Wired)
Physical Layer Wired shielded twisted-pair cable
Duplex Support No
Maximum Units Per CPU 8 units
Allocated Unit Numbers 1 unit number
Current Consumption 0.33 A at 5 VDC
Operating Temperature 0 to 55 deg C
Weight 0.17 kg
Shipping Dimensions 130 x 35 x 110 mm
Standards UC1, N, L, CE

Backplane Bus & Network Determinism

The unit interfaces directly with the CS1 CPU backplane bus communication velocity framework, processing high-speed data links and message services concurrently. Backplane power utilization remains optimized at 0.33 A under standard 5 VDC bus operation, limiting heat dissipation across adjacent slots. Network synchronization relies on token-ring passing over shielded twisted-pair cabling, maintaining deterministic updates across nodes while preventing bus contention during heavy messaging traffic load. Firmware flash compatibility ensures reliable protocol handling across varying CS1 CPU processor generations.

Kit Packaging Contents

  • 1 x CS1W-CLK23 Controller Link Unit
  • 1 x Terminal Block Connector (Mounted)
  • 1 x Instruction Sheet

Physical Installation Protocol

  • Ensure the CS1 PLC rack system main power supply is completely switched off prior to inserting or removing the module.
  • Mount the unit securely into a designated CS1 CPU Bus Unit slot, ensuring the backplane connector locks flush without forced angle entry.
  • Terminate the wired shielded twisted-pair cable using the correct impedance rating and ground the shield wire at a single point to prevent ground loops.
  • Set the rotary unit number switches on the front panel to an unassigned node address within the 1 to 126 range before powering on the system.

Technical Support FAQ

  • Does the CS1W-CLK23 support hot-swapping on an active backplane?

    No, power to the CPU rack must be completely disconnected before inserting or removing the module to prevent backplane bus damage.

  • What is the total current draw of this module from the backplane?

    The unit draws 0.33 A at 5 VDC from the internal CPU rack backplane power supply.

  • What is the maximum number of CS1W-CLK23 units per CPU rack?

    A maximum of 8 Controller Link Units can be mounted to a single CS1 CPU Unit, provided power budget constraints are met.

  • Can this unit run on a duplex optical fiber network setup?

    No, the CS1W-CLK23 model is designed exclusively for non-duplex wired shielded twisted-pair media architectures.

  • How many unit numbers are allocated to this module on the backplane?

    The unit allocates exactly 1 unit number on the CS1 CPU Bus Unit address map.

  • How should cable shielding be terminated on the terminal block?

    Connect the shield braid directly to the designated shield terminal and tie it to functional earth at one central grounding point.

  • What communication services run simultaneously on this unit?

    The hardware supports both cyclic data link updates and asynchronous explicit message servicing over the same network cable.

  • What firmware requirement exists for backplane compatibility?

    The unit operates with standard CS1 CPU system firmware; verify node switch settings match system configuration software settings.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


PDF Datasheet Official Technical Specifications

CS1W-CLK23 Omron Controller Link Unit CS1 Series

You may also like

From our blog

Latest News and Insights

ABB Robotics Unveils IRB 1700 and Physical AI at CIIF 2026
Nov 03, 2026
Maxwell
ABB Robotics Unveils IRB 1700 and Physical AI at CIIF 2026
ABB Robotics has made its most significant product announcement of the year at the 26th...
Read More
Apple iPhone 18 Pro Mass Production at Foxconn Zhengzhou with AI Automation
Nov 02, 2026
Maxwell
Apple iPhone 18 Pro Mass Production at Foxconn Zhengzhou with AI Automation
Apple's iPhone 18 Pro is entering mass production at Foxconn's Zhengzhou facility, marking the first...
Read More
CIMC Raffles Launches World's First Semi-Submersible Wind-to-Hydrogen Platform Shenhai Hydrogen No. 1
Nov 02, 2026
Maxwell
CIMC Raffles Launches World's First Semi-Submersible Wind-to-Hydrogen Platform Shenhai Hydrogen N...
CIMC Raffles Offshore, a subsidiary of China International Marine Containers Group, has launched the world's...
Read More
Envision Technology Launches AI Wind Storage Integrated Machine Product Matrix at CWP 2026
Nov 02, 2026
Maxwell
Envision Technology Launches AI Wind Storage Integrated Machine Product Matrix at CWP 2026
Envision Technology has unveiled a comprehensive AI Wind Storage Integrated Machine product matrix at the...
Read More
Hithium Chongqing Base Becomes World's First Lighthouse Factory for Energy Storage Battery Production
Nov 01, 2026
Maxwell
IFR Reports Global Industrial Robot Stock Surges to 5 Million Units as China Drives Growth
The density of industrial robots per 10,000 manufacturing employees in China has climbed to approximately...
Read More
IDC Reports Q3 2026 Global Smartphone Shipments Plunge 22 Percent Amid Memory Chip Crisis
Nov 01, 2026
Maxwell
IDC Reports Q3 2026 Global Smartphone Shipments Plunge 22 Percent Amid Memory Chip Crisis
The global smartphone market experienced its sharpest quarterly decline on record in the third quarter...
Read More
Hithium Chongqing Base Becomes World's First Lighthouse Factory for Energy Storage Battery Production
Nov 01, 2026
Maxwell
Hithium Chongqing Base Becomes World's First Lighthouse Factory for Energy Storage Battery Produc...
Hithium Energy Storage's Chongqing base has achieved a major production milestone, reaching 200 gigawatt-hours of...
Read More
China Three Ministries Release Hydrogen Energy Comprehensive Application Pilot Management Measures with 1.6 Billion Yuan Central Funding
Oct 31, 2026
Maxwell
China Three Ministries Release Hydrogen Energy Comprehensive Application Pilot Management Measure...
China's Ministry of Industry and Information Technology (MIIT), Ministry of Finance, and National Development and...
Read More
Intel Seeks FCC Exemption for Foreign Robots to Maintain U.S. Semiconductor Production Lines
Oct 31, 2026
Maxwell
Intel Seeks FCC Exemption for Foreign Robots to Maintain U.S. Semiconductor Production Lines
Intel Corporation has submitted a formal petition to the U.S. Federal Communications Commission (FCC) requesting...
Read More
China's First Million-Ton Low-Concentration CCUS Full-Chain Demonstration Project Starts Construction at Shengli Oilfield
Oct 31, 2026
Maxwell
China's First Million-Ton Low-Concentration CCUS Full-Chain Demonstration Project Starts Construc...
China's largest carbon capture, utilization, and storage (CCUS) initiative targeting low-concentration emissions has officially commenced...
Read More