E5AK-AA2B Omron Digital Controller E5AK Series
E5AK-AA2B Omron Digital Controller E5AK Series
E5AK-AA2B Omron Digital Controller E5AK Series
E5AK-AA2B Omron Digital Controller E5AK Series
Omron

E5AK-AA2B Omron Digital Controller E5AK Series

SKU: E5AK-AA2B
Categories : All Products
In Stock
  • Dimensions: 9.6cm x 11.35cm x 9.6cm
  • Country of origin: Japan
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

The Omron E5AK-AA2B, also cataloged as the E5AK Digital Controller, operates as a dedicated hardware component for closed-loop temperature and process regulation within industrial control panel networks.

Nomenclature & Identification

  • E5AK: Base Series Designator (96 x 96 mm DIN Panel Unit)
  • AA: Standard Control Model Architecture
  • 2: Dual Alarm Output Configuration
  • B: Advanced Auxiliary Feature Set Integration

Hardware Specifications

Parameter Specification
Model E5AK-AA2B
Brand Omron
Origin Japan
Weight 0.5 kg
Shipping Dimensions 9.6 cm x 11.35 cm x 9.6 cm
Panel Cutout Dimensions 92 mm x 92 mm
Power Consumption 16 VA max
Operating Temp -10 to 55 deg C
Alarm Outputs 2 relay outputs

Bus Communication & Firmware Protocols

The module interfaces directly with internal panel backplanes and industrial communication buses. Data transfer protocols manage deterministic cycle speeds, allowing rapid polling of process variables and control loop execution. Flash memory routines enforce firmware revision compatibility checks during power-up sequences to prevent operational instruction mismatching across network nodes.

Package Contents

  • 1 x Omron E5AK-AA2B Digital Controller Unit
  • 2 x Panel Mounting Brackets
  • 1 x Terminal Cover Block
  • 1 x Technical Instruction Leaflet

Field Mounting Guidelines

  • Ensure panel cutout dimensions strictly adhere to 92 mm x 92 mm tolerance limits before insertion.
  • Maintain minimum 30 mm vertical and horizontal spacing between adjacent controllers for heat convection.
  • Connect shield wiring directly to a low-impedance ground bar using short, direct leads.
  • Torque terminal block connections to 0.5 Nm to ensure stable electrical conductivity.

Frequently Asked Questions

  • What panel dimensions are required for proper mechanical mounting?

    The unit requires a standard 1/4 DIN cutout measuring 92 mm x 92 mm. Depth behind the front panel panel face must accommodate at least 113.5 mm clearance for terminal block access and wiring radius.

  • What supply voltage ranges are compatible with the control terminal block?

    The controller operates across a rated supply voltage range of 100 to 240 VAC at 50/60 Hz. Power consumption must be calculated at up to 16 VA max under full output load conditions.

  • How are the alarm outputs physically switched?

    The alarm stage contains two independent relay outputs. Each relay contact is internally rated for resistive load switching up to 250 VAC at 1 A, configured for open/close threshold monitoring.

  • Is field replacement supported while the system remains energized?

    Hot-swapping is not permitted on this unit. Main supply power must be disconnected prior to removing the front chassis from the housing socket to prevent arcing and internal damage.

  • What grounding procedures must be followed for noise suppression?

    Signal lines must utilize twisted-pair shielded cables. Ground the shield at a single point to an isolated instrument ground bar, keeping power lines separated from signal wiring conduits.

  • How does firmware flash compatibility affect system replacement?

    Replacement units must match existing firmware revision baselines to retain parameter structure mapping. Mismatched firmware can cause communication errors across serial networks.

  • What operating ambient temperature range is supported without derating?

    The unit operates continuously within -10 to 55 deg C ambient air temperature. Surrounding enclosure ventilation must prevent heat entrapment above 55 deg C to avoid drift.

  • What wire gauge is recommended for terminal connection points?

    Use stranded or solid copper wire rated AWG 22 to AWG 14 for signal and power terminals. Crimp pin terminals must be applied prior to securing under screw clamp plates.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

ABB Robotics Unveils IRB 1700 and Physical AI at CIIF 2026
Nov 03, 2026
Maxwell
ABB Robotics Unveils IRB 1700 and Physical AI at CIIF 2026
ABB Robotics has made its most significant product announcement of the year at the 26th...
Read More
Apple iPhone 18 Pro Mass Production at Foxconn Zhengzhou with AI Automation
Nov 02, 2026
Maxwell
Apple iPhone 18 Pro Mass Production at Foxconn Zhengzhou with AI Automation
Apple's iPhone 18 Pro is entering mass production at Foxconn's Zhengzhou facility, marking the first...
Read More
CIMC Raffles Launches World's First Semi-Submersible Wind-to-Hydrogen Platform Shenhai Hydrogen No. 1
Nov 02, 2026
Maxwell
CIMC Raffles Launches World's First Semi-Submersible Wind-to-Hydrogen Platform Shenhai Hydrogen N...
CIMC Raffles Offshore, a subsidiary of China International Marine Containers Group, has launched the world's...
Read More
Envision Technology Launches AI Wind Storage Integrated Machine Product Matrix at CWP 2026
Nov 02, 2026
Maxwell
Envision Technology Launches AI Wind Storage Integrated Machine Product Matrix at CWP 2026
Envision Technology has unveiled a comprehensive AI Wind Storage Integrated Machine product matrix at the...
Read More
Hithium Chongqing Base Becomes World's First Lighthouse Factory for Energy Storage Battery Production
Nov 01, 2026
Maxwell
IFR Reports Global Industrial Robot Stock Surges to 5 Million Units as China Drives Growth
The density of industrial robots per 10,000 manufacturing employees in China has climbed to approximately...
Read More
IDC Reports Q3 2026 Global Smartphone Shipments Plunge 22 Percent Amid Memory Chip Crisis
Nov 01, 2026
Maxwell
IDC Reports Q3 2026 Global Smartphone Shipments Plunge 22 Percent Amid Memory Chip Crisis
The global smartphone market experienced its sharpest quarterly decline on record in the third quarter...
Read More
Hithium Chongqing Base Becomes World's First Lighthouse Factory for Energy Storage Battery Production
Nov 01, 2026
Maxwell
Hithium Chongqing Base Becomes World's First Lighthouse Factory for Energy Storage Battery Produc...
Hithium Energy Storage's Chongqing base has achieved a major production milestone, reaching 200 gigawatt-hours of...
Read More
China Three Ministries Release Hydrogen Energy Comprehensive Application Pilot Management Measures with 1.6 Billion Yuan Central Funding
Oct 31, 2026
Maxwell
China Three Ministries Release Hydrogen Energy Comprehensive Application Pilot Management Measure...
China's Ministry of Industry and Information Technology (MIIT), Ministry of Finance, and National Development and...
Read More
Intel Seeks FCC Exemption for Foreign Robots to Maintain U.S. Semiconductor Production Lines
Oct 31, 2026
Maxwell
Intel Seeks FCC Exemption for Foreign Robots to Maintain U.S. Semiconductor Production Lines
Intel Corporation has submitted a formal petition to the U.S. Federal Communications Commission (FCC) requesting...
Read More
China's First Million-Ton Low-Concentration CCUS Full-Chain Demonstration Project Starts Construction at Shengli Oilfield
Oct 31, 2026
Maxwell
China's First Million-Ton Low-Concentration CCUS Full-Chain Demonstration Project Starts Construc...
China's largest carbon capture, utilization, and storage (CCUS) initiative targeting low-concentration emissions has officially commenced...
Read More