KFD2-STC5-Ex1.H Pepperl+Fuchs SMART Transmitter Power Supply K-System
KFD2-STC5-Ex1.H Pepperl+Fuchs SMART Transmitter Power Supply K-System
Pepperl+Fuchs

KFD2-STC5-Ex1.H Pepperl+Fuchs SMART Transmitter Power Supply K-System

SKU: KFD2-STC5-EX1.H
Categories : All Products
In Stock
  • Dimensions: 20 mm x 119 mm x 115 mm
  • Country of origin: Germany
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

The Pepperl+Fuchs KFD2-STC5-Ex1.H, also cataloged as the KFD2-STC5-Ex1.H SMART Transmitter Power Supply, operates as a dedicated hardware component for supplying 2-wire and 3-wire SMART transmitters and transferring 0/4-20 mA signals within hazardous field locations.

Hardware Specifications

Parameter Specification
Model KFD2-STC5-Ex1.H
Brand Pepperl+Fuchs
Origin Germany
Weight Approx. 150 g
Shipping Dimensions 20 mm x 119 mm x 115 mm
Operating Temp -20 deg C to +60 deg C (-4 deg F to +140 deg F)
Power Consumption Max. 1.8 W
Supply Voltage 19 VDC to 30 VDC via Power Rail or terminals 14+, 15-
Number of Channels 1 channel
Input Signal 2-wire / 3-wire SMART transmitters, 0/4-20 mA
Output Signal 0/4-20 mA (active or passive configuration)
Signal Transmission Bi-directional HART signal transparent pass-through

Intrinsic Safety Barriers and Protection Limits

The module integrates certified intrinsic safety (Ex i) barriers rated up to Ex ia IIC for direct interface with field instrumentation located in Zone 0, 1, or 2 hazardous areas. High galvanic isolation isolates the hazardous field circuit from non-hazardous control system I/O and auxiliary power networks. Internal safety barriers enforce strict voltage, current, and power limits under worst-case fault conditions, preventing thermal or spark ignition in flammable dust or gas atmospheres.

Field Installation Guidelines

DIN-Rail Mounting and Thermal Clearance

  • Snap the module vertically onto a 35 mm DIN mounting rail (EN 60079-15) or position directly onto an integrated Power Rail system busbar.
  • Maintain a minimum vertical clearance of 50 mm above and below the housing to facilitate natural thermal dissipation.

Wiring Isolation and Shield Grounding

  • Maintain a minimum separation distance of 50 mm between intrinsically safe blue terminals and non-intrinsically safe power or signal lines.
  • Route field cables using twisted-pair shielded cabling and terminate the shield to a single ground point on the main enclosure ground bar.

Ordering Information

  • Primary Product Code: KFD2-STC5-Ex1.H
  • Box Contents: 1x KFD2-STC5-Ex1.H SMART transmitter power supply module, 1x set of removable screw terminals, 1x quick start manual.
  • Compatible Rail Accessories: Power Rail UPR-03, Power Feed Module KFD2-EB2.

Frequently Asked Questions

Q: Does the KFD2-STC5-Ex1.H support bi-directional HART communication signals? A: Yes, the module supports HART communication protocols by passing bi-directional high-frequency digital signals over the 4-20 mA analog loop.

Q: Can this module power both 2-wire and 3-wire transmitters? A: Yes, terminal connections allow wiring configurations for both 2-wire powered transmitters and 3-wire current source instruments.

Q: How is the module powered during standard cabinet operation? A: Auxiliary 24 VDC power can be applied directly to terminals 14+ and 15- or supplied through the DIN-rail mounted Power Rail system.

Q: What is the maximum peak isolation voltage for the internal barrier? A: Safe galvanic isolation provides voltage peak isolation up to 375 V between hazardous field inputs, control side outputs, and supply terminals in compliance with EN 60079-11.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

ABB Robotics Unveils IRB 1700 and Physical AI at CIIF 2026
Nov 03, 2026
Maxwell
ABB Robotics Unveils IRB 1700 and Physical AI at CIIF 2026
ABB Robotics has made its most significant product announcement of the year at the 26th...
Read More
Apple iPhone 18 Pro Mass Production at Foxconn Zhengzhou with AI Automation
Nov 02, 2026
Maxwell
Apple iPhone 18 Pro Mass Production at Foxconn Zhengzhou with AI Automation
Apple's iPhone 18 Pro is entering mass production at Foxconn's Zhengzhou facility, marking the first...
Read More
CIMC Raffles Launches World's First Semi-Submersible Wind-to-Hydrogen Platform Shenhai Hydrogen No. 1
Nov 02, 2026
Maxwell
CIMC Raffles Launches World's First Semi-Submersible Wind-to-Hydrogen Platform Shenhai Hydrogen N...
CIMC Raffles Offshore, a subsidiary of China International Marine Containers Group, has launched the world's...
Read More
Envision Technology Launches AI Wind Storage Integrated Machine Product Matrix at CWP 2026
Nov 02, 2026
Maxwell
Envision Technology Launches AI Wind Storage Integrated Machine Product Matrix at CWP 2026
Envision Technology has unveiled a comprehensive AI Wind Storage Integrated Machine product matrix at the...
Read More
Hithium Chongqing Base Becomes World's First Lighthouse Factory for Energy Storage Battery Production
Nov 01, 2026
Maxwell
IFR Reports Global Industrial Robot Stock Surges to 5 Million Units as China Drives Growth
The density of industrial robots per 10,000 manufacturing employees in China has climbed to approximately...
Read More
IDC Reports Q3 2026 Global Smartphone Shipments Plunge 22 Percent Amid Memory Chip Crisis
Nov 01, 2026
Maxwell
IDC Reports Q3 2026 Global Smartphone Shipments Plunge 22 Percent Amid Memory Chip Crisis
The global smartphone market experienced its sharpest quarterly decline on record in the third quarter...
Read More
Hithium Chongqing Base Becomes World's First Lighthouse Factory for Energy Storage Battery Production
Nov 01, 2026
Maxwell
Hithium Chongqing Base Becomes World's First Lighthouse Factory for Energy Storage Battery Produc...
Hithium Energy Storage's Chongqing base has achieved a major production milestone, reaching 200 gigawatt-hours of...
Read More
China Three Ministries Release Hydrogen Energy Comprehensive Application Pilot Management Measures with 1.6 Billion Yuan Central Funding
Oct 31, 2026
Maxwell
China Three Ministries Release Hydrogen Energy Comprehensive Application Pilot Management Measure...
China's Ministry of Industry and Information Technology (MIIT), Ministry of Finance, and National Development and...
Read More
Intel Seeks FCC Exemption for Foreign Robots to Maintain U.S. Semiconductor Production Lines
Oct 31, 2026
Maxwell
Intel Seeks FCC Exemption for Foreign Robots to Maintain U.S. Semiconductor Production Lines
Intel Corporation has submitted a formal petition to the U.S. Federal Communications Commission (FCC) requesting...
Read More
China's First Million-Ton Low-Concentration CCUS Full-Chain Demonstration Project Starts Construction at Shengli Oilfield
Oct 31, 2026
Maxwell
China's First Million-Ton Low-Concentration CCUS Full-Chain Demonstration Project Starts Construc...
China's largest carbon capture, utilization, and storage (CCUS) initiative targeting low-concentration emissions has officially commenced...
Read More