NJ101-1000 Omron Sysmac NJ Series Sysmac NJ1 CPU
NJ101-1000 Omron Sysmac NJ Series Sysmac NJ1 CPU
NJ101-1000 Omron Sysmac NJ Series Sysmac NJ1 CPU
NJ101-1000 Omron Sysmac NJ Series Sysmac NJ1 CPU
Omron

NJ101-1000 Omron Sysmac NJ Series Sysmac NJ1 CPU

SKU: NJ101-1000
Categories : All Products
In Stock
  • Dimensions: 9 cm x 9 cm x 9cm
  • Country of origin: Japan
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

The Omron NJ101-1000, also cataloged as the NJ101-1000 Sysmac NJ1 CPU, operates as a dedicated hardware component for real-time motion control and sequence execution within Sysmac automation architecture platforms. It features a primary task cycle time of 1 ms and manages up to 2 synchronous axes (6 total axes including virtual). Equipped with 0.5 MB variables memory, embedded EtherCAT Master, EtherNet/IP, and USB interfaces, it coordinates system execution across CJ I/O bus expansion units and up to 64 remote I/O nodes.

Model Number Code Structure

  • NJ101: Sysmac NJ1 controller architecture baseline model.
  • 1000: Core functional hardware profile with database connectivity support.

Technical Performance Metrics

Parameter Specification
Model NJ101-1000
Brand Omron
Origin Japan
Weight 2.0 kg
Shipping Dimensions 9 x 9 x 9 cm
Operating Temp 0 to 55 deg C
Power Consumption Not specified
Primary Task Cycle Time 1 ms
Variables Memory 0.5 MB
Synchronous Axes 2 max
Total Axes (incl. Virtual) 6 max
Embedded Ports EtherCAT Master, EtherNet/IP, USB
Communication Options CAN, CompoNet, DeviceNet, EtherCAT Slave, Modbus, PROFIBUS DP, PROFINET, Serial RS-232C/422/485
Remote I/O Nodes 64 max
I/O System Bus CJ I/O Bus
Expansion Units 40 max

Deterministic Architecture & Bus Integration

The CPU unit manages cyclic motion tasks over EtherCAT deterministic networks while handling upstream plant data via EtherNet/IP. Backplane bus communication velocity across the local CJ I/O bus allows seamless scaling for high I/O density configurations without degrading execution loops. System stability and long-term deployment compatibility are maintained via strict firmware flash compatibility across connected fieldbus couplers and motion drives.

Supply Package Checklist

  • 1 x Omron NJ101-1000 Sysmac NJ1 CPU Module
  • 1 x Operation Instruction Manual

Field Installation & Wiring Guidelines

  • Rack & DIN Installation: Mount the processor onto a standard DIN rail, locking side clips firmly to establish rigid mechanical grounding.
  • CJ Bus Coupling: Slide adjacent CJ I/O expansion units together along the side bus connectors until locking levers click fully into place.
  • EtherCAT Fieldbus Cabling: Connect Category 5e STP cables to the EtherCAT Master port, grounding cable shielding to eliminate noise.
  • Power Supply Connection: Wire a regulated 24 VDC external power supply module directly to the CPU power terminals using short wire runs.
  • Port Isolation: Keep RS-232C/422/485 serial communication cabling physically separated from high-voltage AC lines to prevent interference.

Technical Knowledge Base

  • Does the NJ101-1000 CPU support hot-swapping of CJ expansion I/O units during operation?

    No. Main system power must be disconnected before removing or adding modules on the CJ I/O bus to prevent backplane bus damage.

  • What limits apply to the EtherCAT master network synchronization cycle?

    The primary task cycle operates down to 1 ms, delivering synchronized axis positioning for up to 2 real motion axes.

  • How does the unit preserve database connectivity records during unexpected power outages?

    System variables and database buffer queues are retained in non-volatile memory, preventing data loss when power is interrupted.

  • Can the CPU communicate simultaneously on EtherNet/IP and optional PROFIBUS DP networks?

    Yes. The onboard EtherNet/IP port operates independently alongside optional communication cards installed on the system rack.

  • What cable specifications are mandatory for EtherCAT Master port connections?

    Industrial Grade Category 5e or higher double-shielded twisted-pair (STP) Ethernet cables with RJ45 metal connectors must be used.

  • How are firmware updates flashed to the controller module?

    Firmware flash compatibility procedures are executed using Sysmac Studio software connected via the onboard USB or EtherNet/IP port.

  • What happens when the maximum limit of 64 remote I/O nodes is exceeded?

    The controller generates a bus configuration error during startup and halts network initialization until node counts match limits.

  • Does the CJ I/O bus require end cover terminators?

    Yes. The right-hand end of the CJ expansion rack requires a dedicated end cover to terminate the internal backplane bus correctly.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

ABB Robotics Unveils IRB 1700 and Physical AI at CIIF 2026
Nov 03, 2026
Maxwell
ABB Robotics Unveils IRB 1700 and Physical AI at CIIF 2026
ABB Robotics has made its most significant product announcement of the year at the 26th...
Read More
Apple iPhone 18 Pro Mass Production at Foxconn Zhengzhou with AI Automation
Nov 02, 2026
Maxwell
Apple iPhone 18 Pro Mass Production at Foxconn Zhengzhou with AI Automation
Apple's iPhone 18 Pro is entering mass production at Foxconn's Zhengzhou facility, marking the first...
Read More
CIMC Raffles Launches World's First Semi-Submersible Wind-to-Hydrogen Platform Shenhai Hydrogen No. 1
Nov 02, 2026
Maxwell
CIMC Raffles Launches World's First Semi-Submersible Wind-to-Hydrogen Platform Shenhai Hydrogen N...
CIMC Raffles Offshore, a subsidiary of China International Marine Containers Group, has launched the world's...
Read More
Envision Technology Launches AI Wind Storage Integrated Machine Product Matrix at CWP 2026
Nov 02, 2026
Maxwell
Envision Technology Launches AI Wind Storage Integrated Machine Product Matrix at CWP 2026
Envision Technology has unveiled a comprehensive AI Wind Storage Integrated Machine product matrix at the...
Read More
Hithium Chongqing Base Becomes World's First Lighthouse Factory for Energy Storage Battery Production
Nov 01, 2026
Maxwell
IFR Reports Global Industrial Robot Stock Surges to 5 Million Units as China Drives Growth
The density of industrial robots per 10,000 manufacturing employees in China has climbed to approximately...
Read More
IDC Reports Q3 2026 Global Smartphone Shipments Plunge 22 Percent Amid Memory Chip Crisis
Nov 01, 2026
Maxwell
IDC Reports Q3 2026 Global Smartphone Shipments Plunge 22 Percent Amid Memory Chip Crisis
The global smartphone market experienced its sharpest quarterly decline on record in the third quarter...
Read More
Hithium Chongqing Base Becomes World's First Lighthouse Factory for Energy Storage Battery Production
Nov 01, 2026
Maxwell
Hithium Chongqing Base Becomes World's First Lighthouse Factory for Energy Storage Battery Produc...
Hithium Energy Storage's Chongqing base has achieved a major production milestone, reaching 200 gigawatt-hours of...
Read More
China Three Ministries Release Hydrogen Energy Comprehensive Application Pilot Management Measures with 1.6 Billion Yuan Central Funding
Oct 31, 2026
Maxwell
China Three Ministries Release Hydrogen Energy Comprehensive Application Pilot Management Measure...
China's Ministry of Industry and Information Technology (MIIT), Ministry of Finance, and National Development and...
Read More
Intel Seeks FCC Exemption for Foreign Robots to Maintain U.S. Semiconductor Production Lines
Oct 31, 2026
Maxwell
Intel Seeks FCC Exemption for Foreign Robots to Maintain U.S. Semiconductor Production Lines
Intel Corporation has submitted a formal petition to the U.S. Federal Communications Commission (FCC) requesting...
Read More
China's First Million-Ton Low-Concentration CCUS Full-Chain Demonstration Project Starts Construction at Shengli Oilfield
Oct 31, 2026
Maxwell
China's First Million-Ton Low-Concentration CCUS Full-Chain Demonstration Project Starts Construc...
China's largest carbon capture, utilization, and storage (CCUS) initiative targeting low-concentration emissions has officially commenced...
Read More