NS5-TQ11B-V2 Omron Programmable Terminal NS Series
Omron

NS5-TQ11B-V2 Omron Programmable Terminal NS Series

SKU: NS5-TQ11B-V2
Categories : All Products
In Stock
  • Dimensions: 5.4cm x 19.5cm x 14.2cm
  • Country of origin: Japan
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

Configured for human-machine interface manipulation and real-time process visualization in automated machine cells, the Omron NS5-TQ11B-V2 (NS5-TQ11 Programmable Terminal) provides direct physical/electrical execution.

Hardware Identification & Designation

  • NS5: 5.7-inch Display Class Hardware Platform
  • TQ: Color TFT Liquid Crystal Display Assembly
  • 11: Integrated Ethernet Communications Port (10/100Base-T)
  • B: Black Enclosure Front Bezel Housing
  • V2: System Hardware Revision Iteration

Equipment Parameters & Functional Attributes

Parameter Specification
Model NS5-TQ11B-V2
Brand Omron
Origin Japan
Weight 1 kg
Shipping Weight 8 kg
Shipping Dimensions 5.4 cm x 19.5 cm x 14.2 cm
Operating Temp Not specified
Power Consumption Not specified
Display Element TFT Color LCD
Screen Size 5.7 inch
Resolution 320 x 240 dots
Enclosure Color Black
Network Port 10/100Base-T Ethernet

Deterministic Network Bus & Firmware Flash Execution

The operator interface transfers user input commands and system parameters across 10/100Base-T Ethernet networks directly to host controllers. On unit startup, internal system routines execute firmware flash compatibility verification to validate installed runtime screen code against controller memory register structures, preventing transmission jitter and bit mapping mismatch during high-speed data exchanges.

Delivery Package Components

  • 1 x Omron NS5-TQ11B-V2 Programmable Terminal Unit
  • 4 x Panel Mounting Clamp Assemblies
  • 1 x Power Supply Input Connector Block
  • 1 x Waterproof Rubber Sealing Gasket

Mounting Setup & Wiring Guidelines

  • Cut the designated rectangular opening into the control panel door and fit the sealing gasket into the rear perimeter slot of the front bezel.
  • Insert the terminal into the panel cutout and tighten all four panel mounting clamps evenly to maintain IP65F front panel protection.
  • Connect a 24 VDC power supply to the dedicated terminal block, keeping conductors separated from high-voltage motor power wiring.
  • Connect the functional ground (FG) terminal to a dedicated low-impedance grounding bar inside the panel using stranded copper wire.

Frequently Asked Questions

  • What display technology and resolution are built into the terminal screen?

    The unit features a 5.7-inch color TFT LCD display operating at a hardware resolution of 320 x 240 dots.

  • What network interface is integrated into the rear housing assembly?

    The terminal incorporates a single 10/100Base-T Ethernet port for high-speed host controller communications.

  • What physical dimensions define the outer enclosure housing?

    The outer frame measures 5.4 cm in depth, 19.5 cm in width, and 14.2 cm in height (5.4 cm x 19.5 cm x 14.2 cm).

  • How does firmware flash compatibility affect unit operation during boot?

    System initialization verifies firmware flash checksums to match screen application code with connected controller protocols.

  • What mounting method maintains front panel environmental sealing?

    Securing the unit with four panel clamps against the rubber gasket provides IP65F protection against water ingress.

  • What is the net physical weight of the terminal hardware?

    The net hardware weight of the terminal unit is 1 kg (shipping weight 8 kg).

  • How should communication cables be routed to prevent electrical interference?

    Route 10/100Base-T Ethernet lines through isolated low-voltage conduits away from heavy AC drive power lines.

  • Can the terminal be replaced without shutting down system power supply lines?

    No, external 24 VDC supply power must be isolated prior to removing or installing the wiring block and terminal frame.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


PDF Datasheet Official Technical Specifications

NS5-TQ11B-V2 Omron Programmable Terminal NS Series

You may also like

From our blog

Latest News and Insights

ABB Robotics Unveils IRB 1700 and Physical AI at CIIF 2026
Nov 03, 2026
Maxwell
ABB Robotics Unveils IRB 1700 and Physical AI at CIIF 2026
ABB Robotics has made its most significant product announcement of the year at the 26th...
Read More
Apple iPhone 18 Pro Mass Production at Foxconn Zhengzhou with AI Automation
Nov 02, 2026
Maxwell
Apple iPhone 18 Pro Mass Production at Foxconn Zhengzhou with AI Automation
Apple's iPhone 18 Pro is entering mass production at Foxconn's Zhengzhou facility, marking the first...
Read More
CIMC Raffles Launches World's First Semi-Submersible Wind-to-Hydrogen Platform Shenhai Hydrogen No. 1
Nov 02, 2026
Maxwell
CIMC Raffles Launches World's First Semi-Submersible Wind-to-Hydrogen Platform Shenhai Hydrogen N...
CIMC Raffles Offshore, a subsidiary of China International Marine Containers Group, has launched the world's...
Read More
Envision Technology Launches AI Wind Storage Integrated Machine Product Matrix at CWP 2026
Nov 02, 2026
Maxwell
Envision Technology Launches AI Wind Storage Integrated Machine Product Matrix at CWP 2026
Envision Technology has unveiled a comprehensive AI Wind Storage Integrated Machine product matrix at the...
Read More
Hithium Chongqing Base Becomes World's First Lighthouse Factory for Energy Storage Battery Production
Nov 01, 2026
Maxwell
IFR Reports Global Industrial Robot Stock Surges to 5 Million Units as China Drives Growth
The density of industrial robots per 10,000 manufacturing employees in China has climbed to approximately...
Read More
IDC Reports Q3 2026 Global Smartphone Shipments Plunge 22 Percent Amid Memory Chip Crisis
Nov 01, 2026
Maxwell
IDC Reports Q3 2026 Global Smartphone Shipments Plunge 22 Percent Amid Memory Chip Crisis
The global smartphone market experienced its sharpest quarterly decline on record in the third quarter...
Read More
Hithium Chongqing Base Becomes World's First Lighthouse Factory for Energy Storage Battery Production
Nov 01, 2026
Maxwell
Hithium Chongqing Base Becomes World's First Lighthouse Factory for Energy Storage Battery Produc...
Hithium Energy Storage's Chongqing base has achieved a major production milestone, reaching 200 gigawatt-hours of...
Read More
China Three Ministries Release Hydrogen Energy Comprehensive Application Pilot Management Measures with 1.6 Billion Yuan Central Funding
Oct 31, 2026
Maxwell
China Three Ministries Release Hydrogen Energy Comprehensive Application Pilot Management Measure...
China's Ministry of Industry and Information Technology (MIIT), Ministry of Finance, and National Development and...
Read More
Intel Seeks FCC Exemption for Foreign Robots to Maintain U.S. Semiconductor Production Lines
Oct 31, 2026
Maxwell
Intel Seeks FCC Exemption for Foreign Robots to Maintain U.S. Semiconductor Production Lines
Intel Corporation has submitted a formal petition to the U.S. Federal Communications Commission (FCC) requesting...
Read More
China's First Million-Ton Low-Concentration CCUS Full-Chain Demonstration Project Starts Construction at Shengli Oilfield
Oct 31, 2026
Maxwell
China's First Million-Ton Low-Concentration CCUS Full-Chain Demonstration Project Starts Construc...
China's largest carbon capture, utilization, and storage (CCUS) initiative targeting low-concentration emissions has officially commenced...
Read More