Omron V680-HS52-W Cylindrical Antenna V680 Series
Omron

Omron V680-HS52-W Cylindrical Antenna V680 Series

SKU: V680-HS52-W
Categories : All Products
In Stock
  • Dimensions: M22 x 65 mm
  • Country of origin: Japan
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

Configured for high-frequency non-contact RFID tag communication in deterministic networks, the Omron V680-HS52-W (V680-HS52 Cylindrical Antenna) provides direct physical/electrical execution.

Model Nomenclature & Configuration

The V680-HS52-W designation identifies specific mechanical and electrical features within the V680 RFID platform.

  • V680: Base high-frequency industrial RFID series operating at 13.56 MHz.
  • HS: Head system antenna unit designed for read/write module integration.
  • 52: M22 thread diameter form factor with standard sensing distance limits.
  • W: Standard cable configuration featuring an integrated waterproof connector body.

Physical & Electrical Performance

Parameter Specification
Model V680-HS52-W
Brand Omron
Product Type Cylindrical Antenna
Dimensions M22 x 65 mm
Weight 0.85 kg
Shipping Weight 2.0 kg
Operating Temperature -10 deg C to 60 deg C (no icing)
Insulation Resistance 20 MOhm min. at 500 VDC between cable terminals and case
Vibration Resistance 10 to 500 Hz, 1.5-mm double amplitude at 100 m/s2, 10 sweeps in X, Y, Z for 8 min each
Shock Resistance 500 m/s2 in X, Y, and Z directions 3 times each (18 times total)
Network Architecture Backplane bus communication velocity Licences compatible via V680 controllers

Deterministic Network & Bus Integrity

The antenna assembly operates in tandem with V680 ID controllers to achieve deterministic network scan times across EtherNet/IP and Profinet architectures. Signal execution relies on stable backplane processing speed to maintain synchronization during high-speed tag pass-by operations. Noise immunity performance prevents firmware flash compatibility mismatches when routing raw RF data to upper-level PLC processors.

Supplied Components List

  • 1x V680-HS52-W cylindrical antenna unit with attached standard waterproof cable
  • 2x Brass mounting jam nuts for M22 threaded body securing
  • 1x Standard mounting washer set

Mounting & Wiring Procedures

  • Maintain a metal-free zone around the sensing head to prevent attenuation of the 13.56 MHz electromagnetic field.
  • Torque the M22 mounting nuts to a maximum limit of 20 N m to prevent mechanical deformation of the outer housing.
  • Ground the cable shield terminal at the controller side to avoid ground loops and low-frequency noise coupling.
  • Secure the waterproof connector firmly without exceeding the minimal bending radius of the standard cable during execution.

Engineering Questions & Answers

  • What is the primary purpose of the waterproof connector on the V680-HS52-W?

    It protects signal integrity at the terminal coupling from moisture ingress and fluid splash in wet processing areas.

  • Does the antenna housing require grounding through the panel?

    No, internal shielding routes through the cable connector, but insulation must exceed 20 MOhm at 500 VDC from the case.

  • How does external metal affect the M22 cylindrical body installation?

    Surrounding metals alter the inductance, which decreases read/write communication range if metal-free zones are ignored.

  • Can the antenna cable be cut or spliced directly in the field?

    Splicing is prohibited because altering cable length disrupts impedance matching required for 13.56 MHz RF execution.

  • What causes communication retries during high-speed tag reads?

    Extreme vibration or improper backplane synchronization timings between controller and PLC network modules cause retries.

  • How does temperature affect the insulation performance?

    Operating outside -10 deg C to 60 deg C causes thermal stress, degrading insulation below the 20 MOhm threshold.

  • What mechanical force limits apply to the antenna face?

    Impacts must not exceed 500 m/s2 in X, Y, or Z axes to prevent cracking the internal ferrite and coil structure.

  • Is this antenna compatible with non-V680 series tag controllers?

    No, impedance matching and signal modulation limits restrict execution exclusively to Omron V680 controller channels.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

ABB Robotics Unveils IRB 1700 and Physical AI at CIIF 2026
Nov 03, 2026
Maxwell
ABB Robotics Unveils IRB 1700 and Physical AI at CIIF 2026
ABB Robotics has made its most significant product announcement of the year at the 26th...
Read More
Apple iPhone 18 Pro Mass Production at Foxconn Zhengzhou with AI Automation
Nov 02, 2026
Maxwell
Apple iPhone 18 Pro Mass Production at Foxconn Zhengzhou with AI Automation
Apple's iPhone 18 Pro is entering mass production at Foxconn's Zhengzhou facility, marking the first...
Read More
CIMC Raffles Launches World's First Semi-Submersible Wind-to-Hydrogen Platform Shenhai Hydrogen No. 1
Nov 02, 2026
Maxwell
CIMC Raffles Launches World's First Semi-Submersible Wind-to-Hydrogen Platform Shenhai Hydrogen N...
CIMC Raffles Offshore, a subsidiary of China International Marine Containers Group, has launched the world's...
Read More
Envision Technology Launches AI Wind Storage Integrated Machine Product Matrix at CWP 2026
Nov 02, 2026
Maxwell
Envision Technology Launches AI Wind Storage Integrated Machine Product Matrix at CWP 2026
Envision Technology has unveiled a comprehensive AI Wind Storage Integrated Machine product matrix at the...
Read More
Hithium Chongqing Base Becomes World's First Lighthouse Factory for Energy Storage Battery Production
Nov 01, 2026
Maxwell
IFR Reports Global Industrial Robot Stock Surges to 5 Million Units as China Drives Growth
The density of industrial robots per 10,000 manufacturing employees in China has climbed to approximately...
Read More
IDC Reports Q3 2026 Global Smartphone Shipments Plunge 22 Percent Amid Memory Chip Crisis
Nov 01, 2026
Maxwell
IDC Reports Q3 2026 Global Smartphone Shipments Plunge 22 Percent Amid Memory Chip Crisis
The global smartphone market experienced its sharpest quarterly decline on record in the third quarter...
Read More
Hithium Chongqing Base Becomes World's First Lighthouse Factory for Energy Storage Battery Production
Nov 01, 2026
Maxwell
Hithium Chongqing Base Becomes World's First Lighthouse Factory for Energy Storage Battery Produc...
Hithium Energy Storage's Chongqing base has achieved a major production milestone, reaching 200 gigawatt-hours of...
Read More
China Three Ministries Release Hydrogen Energy Comprehensive Application Pilot Management Measures with 1.6 Billion Yuan Central Funding
Oct 31, 2026
Maxwell
China Three Ministries Release Hydrogen Energy Comprehensive Application Pilot Management Measure...
China's Ministry of Industry and Information Technology (MIIT), Ministry of Finance, and National Development and...
Read More
Intel Seeks FCC Exemption for Foreign Robots to Maintain U.S. Semiconductor Production Lines
Oct 31, 2026
Maxwell
Intel Seeks FCC Exemption for Foreign Robots to Maintain U.S. Semiconductor Production Lines
Intel Corporation has submitted a formal petition to the U.S. Federal Communications Commission (FCC) requesting...
Read More
China's First Million-Ton Low-Concentration CCUS Full-Chain Demonstration Project Starts Construction at Shengli Oilfield
Oct 31, 2026
Maxwell
China's First Million-Ton Low-Concentration CCUS Full-Chain Demonstration Project Starts Construc...
China's largest carbon capture, utilization, and storage (CCUS) initiative targeting low-concentration emissions has officially commenced...
Read More