S200-TB3 490176063 ABB Terminal Block Base S200 I/O
ABB

S200-TB3 490176063 ABB Terminal Block Base S200 I/O

SKU: S200-TB3
Categories : ABB
In Stock
  • Dimensions: 9.3 x 9.5 x 5.8 cm
  • Country of origin: Sweden
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

The ABB S200-TB3 490176063, also cataloged as the S200-TB3 Terminal Block, operates as a dedicated hardware component for field signal wiring and I/O module bus interface routing within ABB S200 I/O systems.

Hardware Nomenclature and Signal Interface

Configured as a modular DIN-rail terminal base, the ABB S200-TB3 490176063 routes field wiring to upper plugged-in I/O modules:

  • S200-TB3: Standard model code specifying a 3-wire field termination base layout for 16-point I/O modules.
  • 490176063: Alternate internal ABB part reference identifier (cross-referenced to legacy code 200-TB3).
  • 16-Point Capacity: Provides physical screw or spring termination points supporting up to 16 individual process channels.
  • 2/3-Wire Support: Built-in common voltage and return bus bars facilitate direct 2-wire and 3-wire field sensor terminations.

Structural and Electrical Specifications

Parameter Specification
Model S200-TB3 (490176063 / 200-TB3)
Brand ABB
Origin United States
Product Type Terminal Block
Module Capacity 16 points (2-wire or 3-wire connections)
Operating Bus Voltage 5 VDC (Internal logic bus)
Maximum Bus Current 640 mA
Power Consumption Passive base unit (Power driven by module/bus)
Unit Weight 0.22 kg
Shipping Dimensions 9.3 cm x 9.5 cm x 5.8 cm
Operating Temp 0 to 55 deg C
Storage Temp -40 to 85 deg C

Bus Communication Velocity & I/O Density Scaling

The terminal base features integrated backplane bus pass-through connectors that route logic power and communication signals between adjacent S200 modules. Backplane bus communication velocity handles high-density signal transfers across Profinet or EtherNet/IP deterministic networks without signal attenuation. Firmware flash compatibility across upper I/O modules ensures instant node recognition when snapped onto the terminal base.

Shipping Package Contents

  • 1 x ABB S200-TB3 Terminal Block Unit
  • 1 x Installation grounding clip pre-assembled
  • 1 x Field terminal numbering strip insert

Field Installation & Wiring Rules

  • Power Isolation: Disconnect system 24 VDC field power and 5 VDC backplane power before attaching or wiring the terminal block.
  • DIN-Rail Assembly: Snap the terminal block securely onto a 35 mm DIN rail, ensuring the rear metal grounding spring contacts the rail.
  • Wire Termination: Strip conductor ends to 7 mm and tighten screw terminals to recommended torque specs to ensure solid electrical contact.
  • Adjacent Interlocking: Slide adjacent S200-TB3 bases together firmly to engage side-mounted backplane bus connectors prior to inserting I/O modules.

Frequently Asked Questions

  • What sensor wiring configurations are directly supported by the S200-TB3?

    The unit provides dedicated terminals designed to accommodate both 2-wire and 3-wire field device wiring arrangements.

  • Does the S200-TB3 terminal block consume logic bus current by itself?

    The terminal base is a passive interconnect device rated to pass through up to 640 mA at 5 VDC backplane logic power.

  • Can an I/O module be removed from the S200-TB3 base without disconnecting field wires?

    Yes. The upper I/O module unlatches and plugs out directly, leaving all field signal wiring permanently attached to the base.

  • How are backplane logic signals extended to adjacent I/O slots?

    Integrated side connectors pass backplane data and power continuously to adjacent terminal bases across the DIN rail stack.

  • What alternate manufacturing part numbers correspond to model S200-TB3?

    This unit is cross-referenced under ABB part numbers 200-TB3 and 490176063.

  • Is external grounding required for the terminal block assembly?

    Grounding is established automatically via the integral metal clip when mounted on a clean, properly grounded 35 mm steel DIN rail.

  • What is the total channel density rating for a single S200-TB3 base?

    The base provides terminal capacity designed to interface with 16-channel input or output modules.

  • How does the base maintain connection stability during industrial vibration?

    Built-in DIN-rail locking mechanisms and module latching guides hold the assembly securely against industrial mechanical shock.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

ABB Robotics Unveils IRB 1700 and Physical AI at CIIF 2026
Nov 03, 2026
Maxwell
ABB Robotics Unveils IRB 1700 and Physical AI at CIIF 2026
ABB Robotics has made its most significant product announcement of the year at the 26th...
Read More
Apple iPhone 18 Pro Mass Production at Foxconn Zhengzhou with AI Automation
Nov 02, 2026
Maxwell
Apple iPhone 18 Pro Mass Production at Foxconn Zhengzhou with AI Automation
Apple's iPhone 18 Pro is entering mass production at Foxconn's Zhengzhou facility, marking the first...
Read More
CIMC Raffles Launches World's First Semi-Submersible Wind-to-Hydrogen Platform Shenhai Hydrogen No. 1
Nov 02, 2026
Maxwell
CIMC Raffles Launches World's First Semi-Submersible Wind-to-Hydrogen Platform Shenhai Hydrogen N...
CIMC Raffles Offshore, a subsidiary of China International Marine Containers Group, has launched the world's...
Read More
Envision Technology Launches AI Wind Storage Integrated Machine Product Matrix at CWP 2026
Nov 02, 2026
Maxwell
Envision Technology Launches AI Wind Storage Integrated Machine Product Matrix at CWP 2026
Envision Technology has unveiled a comprehensive AI Wind Storage Integrated Machine product matrix at the...
Read More
Hithium Chongqing Base Becomes World's First Lighthouse Factory for Energy Storage Battery Production
Nov 01, 2026
Maxwell
IFR Reports Global Industrial Robot Stock Surges to 5 Million Units as China Drives Growth
The density of industrial robots per 10,000 manufacturing employees in China has climbed to approximately...
Read More
IDC Reports Q3 2026 Global Smartphone Shipments Plunge 22 Percent Amid Memory Chip Crisis
Nov 01, 2026
Maxwell
IDC Reports Q3 2026 Global Smartphone Shipments Plunge 22 Percent Amid Memory Chip Crisis
The global smartphone market experienced its sharpest quarterly decline on record in the third quarter...
Read More
Hithium Chongqing Base Becomes World's First Lighthouse Factory for Energy Storage Battery Production
Nov 01, 2026
Maxwell
Hithium Chongqing Base Becomes World's First Lighthouse Factory for Energy Storage Battery Produc...
Hithium Energy Storage's Chongqing base has achieved a major production milestone, reaching 200 gigawatt-hours of...
Read More
China Three Ministries Release Hydrogen Energy Comprehensive Application Pilot Management Measures with 1.6 Billion Yuan Central Funding
Oct 31, 2026
Maxwell
China Three Ministries Release Hydrogen Energy Comprehensive Application Pilot Management Measure...
China's Ministry of Industry and Information Technology (MIIT), Ministry of Finance, and National Development and...
Read More
Intel Seeks FCC Exemption for Foreign Robots to Maintain U.S. Semiconductor Production Lines
Oct 31, 2026
Maxwell
Intel Seeks FCC Exemption for Foreign Robots to Maintain U.S. Semiconductor Production Lines
Intel Corporation has submitted a formal petition to the U.S. Federal Communications Commission (FCC) requesting...
Read More
China's First Million-Ton Low-Concentration CCUS Full-Chain Demonstration Project Starts Construction at Shengli Oilfield
Oct 31, 2026
Maxwell
China's First Million-Ton Low-Concentration CCUS Full-Chain Demonstration Project Starts Construc...
China's largest carbon capture, utilization, and storage (CCUS) initiative targeting low-concentration emissions has officially commenced...
Read More