SA910S 3KDE175131L9100 ABB Power Supply Advant OCS/800xA
SA910S 3KDE175131L9100 ABB Power Supply Advant OCS/800xA
ABB

SA910S 3KDE175131L9100 ABB Power Supply Advant OCS/800xA

SKU: 3KDE175131L9100
Categories : ABB
In Stock
  • Dimensions: 6.6 x 12 x 15.5 cm
  • Country of origin: Sweden
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

Configured for primary AC-to-DC voltage conversion in Advant OCS/800xA systems, the ABB SA910S 3KDE175131L9100 (SA910S Power Supply) provides direct physical/electrical execution.

Designator Mapping & Technical Structure

The hardware designator scheme specifies functional parameters across system subracks:

  • SA910S: Main product designator for the regulated system power supply card.
  • 3KDE175131L9100: Manufacturing part reference for subrack slot integration.
  • PS24-Ex: Spare part designation cross-referenced to the 3KDE175131L9100 assembly.
  • Tariff Code: 8537101190 for low-voltage industrial control power supplies.

Electrical & Environmental Data

Parameter Specification
Model SA910S 3KDE175131L9100
Brand ABB
Origin SWEDEN
Product Type Power Supply
Output Voltage 24 VDC
Input Voltage Range 85 to 264 VAC
Line Frequency 47 to 63 Hz
Inrush Current Limit <= 20 A
Power Factor >= 0.95
Power Consumption Not specified (Input/Output converter)
Unit Weight 1.14 kg
Shipping Dimensions 6.6 cm x 12 cm x 15.5 cm
Operating Temp -25 to +70 deg C
Storage Temp -40 to +85 deg C
Relative Humidity 5 to 95 % (non-condensing)

Deterministic Network Bus & Hardware Integration

The module supplies regulated 24 VDC bus power across the local rack assembly to maintain uninterrupted CPU and I/O communication execution. High-density I/O density scaling and real-time data transfers across Profinet or EtherNet/IP deterministic networks rely on stable supply rails, avoiding communication drops. Onboard firmware flash compatibility and system rack logic supervision maintain steady backplane bus communication velocity during system power transients.

Package Delivery Contents

  • 1 x ABB SA910S 3KDE175131L9100 Power Supply Unit
  • 1 x Anti-static protective enclosure bag
  • 1 x Installation guide and pinout reference manual

Subrack Mounting & Wiring Precautions

  • AC Line Disconnection: Isolate external AC mains voltage before inserting or removing the power supply module from the rack slot.
  • Grounding Connection: Ensure the panel enclosure earth stud connects directly to protective earth ground to maintain noise suppression.
  • Convection Clearance: Maintain clear vertical airflow paths above and below the module heat sink to facilitate thermal dissipation.
  • Terminal Screws: Torqued screw terminals on AC supply inputs to prevent high-resistance connections and local thermal buildup.

Frequently Asked Questions

  • What range of AC input voltage does the SA910S 3KDE175131L9100 accommodate?

    The module accepts standard universal AC input sources ranging from 85 to 264 VAC at frequencies of 47 to 63 Hz.

  • What output voltage is generated by the SA910S module for subrack loads?

    The unit provides a regulated 24 VDC bus output to power adjacent controller cards and I/O subrack modules.

  • What is the peak inrush current limit during initial AC power-up?

    The integrated power supply input circuitry limits the cold-start inrush current to <= 20 A under full line loads.

  • Can the SA910S module be hot-swapped while the rack backplane is energized?

    No. System power feeds must be isolated before pulling or inserting the power supply module to prevent internal arcing.

  • How does the module maintain high electrical efficiency on AC mains?

    The unit incorporates active power factor correction circuitry yielding a power factor parameter of >= 0.95.

  • What spare part model code corresponds to the 3KDE175131L9100 hardware?

    The manufacturing spare part cross-reference identifier for this power unit is PS24-Ex 3KDE175131L9100.

  • What ambient temperature limits apply to operating hardware installations?

    The unit operates within industrial thermal limits specified from -25 to +70 deg C under non-condensing humidity.

  • Does the power supply require external forced-air cooling fans?

    Convection cooling operates effectively provided standard vertical clearance dimensions around the module are maintained.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


PDF Datasheet Official Technical Specifications

SA910S 3KDE175131L9100 ABB Power Supply Advant OCS/800xA

You may also like

From our blog

Latest News and Insights

ABB Robotics Unveils IRB 1700 and Physical AI at CIIF 2026
Nov 03, 2026
Maxwell
ABB Robotics Unveils IRB 1700 and Physical AI at CIIF 2026
ABB Robotics has made its most significant product announcement of the year at the 26th...
Read More
Apple iPhone 18 Pro Mass Production at Foxconn Zhengzhou with AI Automation
Nov 02, 2026
Maxwell
Apple iPhone 18 Pro Mass Production at Foxconn Zhengzhou with AI Automation
Apple's iPhone 18 Pro is entering mass production at Foxconn's Zhengzhou facility, marking the first...
Read More
CIMC Raffles Launches World's First Semi-Submersible Wind-to-Hydrogen Platform Shenhai Hydrogen No. 1
Nov 02, 2026
Maxwell
CIMC Raffles Launches World's First Semi-Submersible Wind-to-Hydrogen Platform Shenhai Hydrogen N...
CIMC Raffles Offshore, a subsidiary of China International Marine Containers Group, has launched the world's...
Read More
Envision Technology Launches AI Wind Storage Integrated Machine Product Matrix at CWP 2026
Nov 02, 2026
Maxwell
Envision Technology Launches AI Wind Storage Integrated Machine Product Matrix at CWP 2026
Envision Technology has unveiled a comprehensive AI Wind Storage Integrated Machine product matrix at the...
Read More
Hithium Chongqing Base Becomes World's First Lighthouse Factory for Energy Storage Battery Production
Nov 01, 2026
Maxwell
IFR Reports Global Industrial Robot Stock Surges to 5 Million Units as China Drives Growth
The density of industrial robots per 10,000 manufacturing employees in China has climbed to approximately...
Read More
IDC Reports Q3 2026 Global Smartphone Shipments Plunge 22 Percent Amid Memory Chip Crisis
Nov 01, 2026
Maxwell
IDC Reports Q3 2026 Global Smartphone Shipments Plunge 22 Percent Amid Memory Chip Crisis
The global smartphone market experienced its sharpest quarterly decline on record in the third quarter...
Read More
Hithium Chongqing Base Becomes World's First Lighthouse Factory for Energy Storage Battery Production
Nov 01, 2026
Maxwell
Hithium Chongqing Base Becomes World's First Lighthouse Factory for Energy Storage Battery Produc...
Hithium Energy Storage's Chongqing base has achieved a major production milestone, reaching 200 gigawatt-hours of...
Read More
China Three Ministries Release Hydrogen Energy Comprehensive Application Pilot Management Measures with 1.6 Billion Yuan Central Funding
Oct 31, 2026
Maxwell
China Three Ministries Release Hydrogen Energy Comprehensive Application Pilot Management Measure...
China's Ministry of Industry and Information Technology (MIIT), Ministry of Finance, and National Development and...
Read More
Intel Seeks FCC Exemption for Foreign Robots to Maintain U.S. Semiconductor Production Lines
Oct 31, 2026
Maxwell
Intel Seeks FCC Exemption for Foreign Robots to Maintain U.S. Semiconductor Production Lines
Intel Corporation has submitted a formal petition to the U.S. Federal Communications Commission (FCC) requesting...
Read More
China's First Million-Ton Low-Concentration CCUS Full-Chain Demonstration Project Starts Construction at Shengli Oilfield
Oct 31, 2026
Maxwell
China's First Million-Ton Low-Concentration CCUS Full-Chain Demonstration Project Starts Construc...
China's largest carbon capture, utilization, and storage (CCUS) initiative targeting low-concentration emissions has officially commenced...
Read More