UF C911 B104 3BHE037864R0104 ABB AC 800PEC Circulation Plate
UF C911 B104 3BHE037864R0104 ABB AC 800PEC Circulation Plate
UF C911 B104 3BHE037864R0104 ABB AC 800PEC Circulation Plate
UF C911 B104 3BHE037864R0104 ABB AC 800PEC Circulation Plate
ABB

UF C911 B104 3BHE037864R0104 ABB AC 800PEC Circulation Plate

SKU: UF C911 B104 3BHE037864R0104
Categories : ABB
In Stock
  • Dimensions: 45 x 15.3 x 10.5 cm
  • Country of origin: Sweden
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

The ABB UF C911 B104 3BHE037864R0104 serves as the primary UF C911 B104 Circulation Plate utilized to execute high-speed frequency input/output processing and DC power distribution across AC 800PEC platforms.

Variant Mapping & Designation

  • Base Assembly Model: UF C911 B104
  • Part Number: 3BHE037864R0104
  • Module Category: Circulation Plate / Frequency I/O Board
  • System Compatibility: ABB AC 800PEC High-Performance Control System

Physical & Electrical Operating Parameters

Parameter Specification
Model UF C911 B104 3BHE037864R0104
Brand ABB
Origin Sweden
Weight 2.75 kg
Shipping Dimensions 45.0 x 15.3 x 10.5 cm
Operating Temp -20 deg C to +55 deg C (-4 deg F to +131 deg F)
Power Consumption Not specified
AC Input Voltage 100 VAC to 240 VAC +-10 %
DC Output Voltage 24 VDC
Output Current 4 A continuous
Conversion Efficiency > 85 % at full load
Electrical Isolation 1500 VAC
Storage Temp -40 deg C to +85 deg C
Relative Humidity 5 % to 95 % RH non-condensing
Tariff Code 8537101190

Deterministic Bus Interface & Firmware Synchronization

The circulation plate integrates frequency I/O processing loops with the controller mainboard via direct high-speed interconnects. Backplane bus communication velocity guarantees low-latency deterministic signal routing between field frequency inputs and processor memory registers. Built-in system logic ensures firmware flash compatibility across AC 800PEC hardware revisions while maintaining channel scaling integrity.

Package Contents

  • 1 x ABB UF C911 B104 3BHE037864R0104 Circulation Plate
  • Standard anti-static ESD packaging shield

Cabinet Mounting & Field Installation Rules

  • ESD Safety Precautions
    • Ground personnel via wrist straps before contacting exposed board traces or input connector blocks.
  • Structural Alignment
    • Secure the card firmly into the rack guide slots using hand tools to ensure proper bus connector mating without apply uneven torsional stress.
  • Power Wiring Standards
    • Ensure incoming 100-240 VAC main power lines are de-energized prior to connecting field supply leads to the primary terminal block.
  • Cable Shielding
    • Earth all frequency I/O cable shields at single-point busbars to prevent electrical switching noise from degrading frequency signal accuracy.

Engineering & Operations Technical FAQ

  • What is the continuous output current rating of the integrated DC power circuit?

    The internal power circuit delivers a continuous 24 VDC output at up to 4 A.

  • What input AC voltage range does the power conversion section accept?

    The module accepts an AC input range from 100 VAC to 240 VAC +-10 %.

  • What is the electrical isolation rating between field power and internal logic?

    Galvanic isolation between circuit interfaces is rated at 1500 VAC.

  • What thermal thresholds apply to active field operations?

    Operating temperature must remain between -20 deg C and +55 deg C (-4 deg F to +131 deg F).

  • What efficiency level does the power conversion subsystem achieve?

    The power conversion stage achieves greater than 85 % efficiency under full electrical load conditions.

  • Can the board be inserted into the rack while the backplane power is active?

    Hot-swapping must follow strict AC 800PEC system guidelines; isolate primary AC mains before removal or insertion.

  • How should frequency signal lines be routed inside the panel enclosure?

    Route frequency I/O conductors through separate wire ducts away from high-current AC motor leads to prevent crosstalk.

  • What are the physical transport and shipping clearance dimensions?

    The shipping footprint dimensions measure 45.0 cm in length, 15.3 cm in width, and 10.5 cm in height.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

ABB Robotics Unveils IRB 1700 and Physical AI at CIIF 2026
Nov 03, 2026
Maxwell
ABB Robotics Unveils IRB 1700 and Physical AI at CIIF 2026
ABB Robotics has made its most significant product announcement of the year at the 26th...
Read More
Apple iPhone 18 Pro Mass Production at Foxconn Zhengzhou with AI Automation
Nov 02, 2026
Maxwell
Apple iPhone 18 Pro Mass Production at Foxconn Zhengzhou with AI Automation
Apple's iPhone 18 Pro is entering mass production at Foxconn's Zhengzhou facility, marking the first...
Read More
CIMC Raffles Launches World's First Semi-Submersible Wind-to-Hydrogen Platform Shenhai Hydrogen No. 1
Nov 02, 2026
Maxwell
CIMC Raffles Launches World's First Semi-Submersible Wind-to-Hydrogen Platform Shenhai Hydrogen N...
CIMC Raffles Offshore, a subsidiary of China International Marine Containers Group, has launched the world's...
Read More
Envision Technology Launches AI Wind Storage Integrated Machine Product Matrix at CWP 2026
Nov 02, 2026
Maxwell
Envision Technology Launches AI Wind Storage Integrated Machine Product Matrix at CWP 2026
Envision Technology has unveiled a comprehensive AI Wind Storage Integrated Machine product matrix at the...
Read More
Hithium Chongqing Base Becomes World's First Lighthouse Factory for Energy Storage Battery Production
Nov 01, 2026
Maxwell
IFR Reports Global Industrial Robot Stock Surges to 5 Million Units as China Drives Growth
The density of industrial robots per 10,000 manufacturing employees in China has climbed to approximately...
Read More
IDC Reports Q3 2026 Global Smartphone Shipments Plunge 22 Percent Amid Memory Chip Crisis
Nov 01, 2026
Maxwell
IDC Reports Q3 2026 Global Smartphone Shipments Plunge 22 Percent Amid Memory Chip Crisis
The global smartphone market experienced its sharpest quarterly decline on record in the third quarter...
Read More
Hithium Chongqing Base Becomes World's First Lighthouse Factory for Energy Storage Battery Production
Nov 01, 2026
Maxwell
Hithium Chongqing Base Becomes World's First Lighthouse Factory for Energy Storage Battery Produc...
Hithium Energy Storage's Chongqing base has achieved a major production milestone, reaching 200 gigawatt-hours of...
Read More
China Three Ministries Release Hydrogen Energy Comprehensive Application Pilot Management Measures with 1.6 Billion Yuan Central Funding
Oct 31, 2026
Maxwell
China Three Ministries Release Hydrogen Energy Comprehensive Application Pilot Management Measure...
China's Ministry of Industry and Information Technology (MIIT), Ministry of Finance, and National Development and...
Read More
Intel Seeks FCC Exemption for Foreign Robots to Maintain U.S. Semiconductor Production Lines
Oct 31, 2026
Maxwell
Intel Seeks FCC Exemption for Foreign Robots to Maintain U.S. Semiconductor Production Lines
Intel Corporation has submitted a formal petition to the U.S. Federal Communications Commission (FCC) requesting...
Read More
China's First Million-Ton Low-Concentration CCUS Full-Chain Demonstration Project Starts Construction at Shengli Oilfield
Oct 31, 2026
Maxwell
China's First Million-Ton Low-Concentration CCUS Full-Chain Demonstration Project Starts Construc...
China's largest carbon capture, utilization, and storage (CCUS) initiative targeting low-concentration emissions has officially commenced...
Read More